Source Notes
Chapter 15: Putting It All Together: LC-39 Site Activation
- 1. KSC, "Apollo/Saturn V Facility
Activation Plan," 3rd Coordination Draft, 30 Dec. 1965; Petrone
interview, 17 Sept. 1970; "Presentation of the NASA Oversight
Subcommittee, Committee on Science and Astronautics, House of
Representatives," 29 Oct. 1968, pp. 38-57.
- 2. William T. Clearman, Jr., to T. A.
Strong, "Lt. Col. Donald R. Scheller, USAF (NASA)," 12 Oct. 1964;
Clearman interview, 13 Sept. 1973.
- 3. KSC, "Minutes of Apollo/Saturn V
Site Activation Board Meeting #1," 19 Mar. 1965.
- 4. KSC, LC-39 Site Activation
Master Schedule (Preliminary), Level A, rev. 17 Feb. 1967.
- 5. KSC, "Minutes of Site Activation
Board Meeting #1"; "Presentation to the NASA Oversight
Subcommittee," 29 Oct. 1968, pp. 43-44.
- 6. Gruene to Apollo/Saturn V Test
Off., "Comments on Site Activation Board Charter," 1 Apr. 1965.
- 7. Bagnulo to Scheller, "Site
Activation Board Charter," 30 Mar. 1965.
- 8. 8. Clark to Scheller, "Comments on
Apollo/Saturn V Site Activation Board," 31 Mar. 1965 .
- 9. KSC, "Minutes of Apollo/Saturn V
Site Activation Board Meeting #3," 5 Aug. 1965.
- 10. Donald R. Scheller, "Management
by Exception, Activation of Apollo/Saturn V Launch Complex 39," 15
May 1967; "Presentation to the NASA Oversight Subcommittee," 29
Oct. 1968, pp. 41-42.
- 11. L. S. Harris, Chief, Site
Operation Gp., Engineering and Development Dir., KSC, to Bagnulo,
"Activation Projects, LC-39," 23 Sept. 1965, in KSC Engineering and
Development Dir. Reading Files, 1965-66; "Minutes of KSC Site
Activation Working Group Meeting #1," 3 Dec. 1965; Scheller to SAB,
"Apollo/Saturn V SAB Management Meeting Membership," 19 Jan. 1966.
- 12. Scheller, "Management by
Exception"; Clearman interview, 26 Oct. 1973; Fulton interview;
Chandler interview.
- 13. Boeing Atlantic Test Center
Management Systems Staff, "ERS Recovery Plan," by A. J. Culver and
K. G. Baird, Apr. 1966.
- 14. Scheller, "Management by
Exception"; Murphy interview.
- 15. Petrone's notes, 14 Feb. 1963;
Wagner interview, 21 Sept. 1973; Gassman interview; NASA Apollo
Inter-Center ICD Management Procedure, report CM-001-001-1B,
Jan. 1969, pp. 3-4.
- 16. Petrone, "KSC Apollo/Saturn
Configuration Management Program Directive," 29 Sept. 1965,
Management Configuration Off. files.
- 17. KSC Apollo Program Directive No.
2, 9 Dec. 1965.
- 18. Gassman interview; Leet
interview, 8 Nov. 1973.
- 19. KSC/MSC, ICD-IRN
Processing, 6 May 1968; Wagner interview, 21 Sept. 1973.
- 20. Petrone to Poppel, "VLF-39
Facility Checkout Vehicle Minimum Requirements and Operational
Characteristic," 1 Mar. 1962; Poppel (signed by Owens) to Petrone.
"Minimum Requirements for Facility Checkout Vehicle for Complex
39," 2 Apr. 1962.
- 21. Phillips to NASA Manned Space
Flight Centers, "Apollo Delivery and Launch Schedules," 16 Feb.
1965; Phillips to NASA Manned Space Flight Centers, "Apollo
Schedules and Mission Assignments," 12 Jan. 1965, in Phillips file,
NASA Hq. History Off.; KSC, Plans, Program, and Resources Dir.,
"Verification of '500-F' Schedule Dates Based upon OMSF Approved
Apollo Schedule," 10 Mar. 1966.
- 22. Petrone to Arthur Rudolph, Saturn
V Program Manager, MSFC, 11 Jan. 1966.
- 23. Haggard interview; "Marion Power
and Shovel Company, PMSLC Hearing, Miami. Florida, May 1965,"
contract NASA 10-477, KSC Labor Relations Off.
- 24. Michael E. Haworth, Jr., NASA
Contracting Off., to Marion Power Shovel, "Contract NAS 10-477,"
25 Jan. 1965.
- 25. Clearman to Petrone, Weekly Notes
of 25 June 1965.
- 26. George W. Waiter,
Modifications to Bearings for Traction Support Rollers on
Crawler-Transporters, report KSC TR-260-D, 15 Dec. 1965, pp.
1-2; KSC Weekly Notes, Poppel, 29 July 1965; F. Jones, Technical
Supervisor, to Richard McCoy, "Contract AS 10-477, Salvage of
Bearings," 26 Oct. 1965.
- 27. Waiter, Modifications to
Bearings, p.2; "KSC Press Briefing and Crawler Demonstration,"
25 Jan. 1966, pp. 3-4, 12.
- 28. M. E. Haworth to Patrick Kraft,
Treasurer, Marion Power Shovel Co., 15 June 1965.
- 29. M. E. Haworth to F. Boyle, Pres.,
Marion Power Shovel Co., "NAS 10-477," 14 Oct. 1965; Gordon Harris,
Chief of Public Affairs, to Debus, 30 Sept. 1965.
- 30. Morgan F. Jones to Poppel, 15
Nov. 1965; Poppel, "Weekly Notes to Debus," 8 Oct. 1965; "Technical
Progress Reports," Third Quarter 1965, pp. 3-16; Buchanan
interview, 4 Oct. 1974; Waiter, Modifications to Bearings,
p. 12; "KSC Press Briefing and Crawler Demonstration," 25 Jan.
1966, pp. 16-17.
- 31. KSC Weekly Notes, Poppel, 3, 10
Dec. 1965; Bagnulo, 17 Dec. 1965; Spaceport News, 3 Feb.
1966.
- 32. NASA, PERT, Program Evaluation
and Review Technique, Handbook, NPC-101, 1 Sept. 1961; "KSC
Presentation to the NASA Oversight Subcommittee, Committee on
Science and Astronautics," 29 Oct. 1968, pp. 38-58; Potate
interview, 6 June 1972.
- 33. "Minutes of Apollo/Saturn V Site
Activation Board Meeting #3," 5 Aug. 1965; KSC Weekly Notes,
Petrone, 30 July 1965.
- 34. L. Steven Harris to Bagnulo,
"Site Activation Board Meeting," 28 Oct. 1965, in Engineering and
Development Dir. reading files, 1965-1966; Wiley interview, 31 Oct.
1973.
- 35. Petrone to Phillips, 4 Nov. 1965.
- 36. Petrone to Phillips, "Proposed
SA500-F-l/501 Work Around Schedule," 7 Dec. 1965.
- 37. KSC Weekly Notes, Bagnulo, 17
Nov. 1965; Bagnulo to Debus and others, "Pad A Settlement," 9 Dec.
1965; Roberts interview.
- 38. "Minutes of Apollo/Saturn Site
Activation Board Meeting #14," 6 Jan. 1966; "LC-39 Site Activation
Master Schedule Meeting," 17 Jan. 1966.
- 39. Potter interview; Steven Harris
interview; Tom Wills interview; "Reading File of Engineering
Division's Site Activation Group," Sept. 1965, Steven Harris's
files, KSC.
- 40. "Minutes of Apollo/Saturn V Site
Activation Board Meeting #16," 3 Feb. 1966; KSC, "PERT Analysis
Report," 20 Jan. 1966.
- 41. Clearman, Weekly Notes to
Petrone, 7 Jan., 4, 18, 25 Feb., 3 Mar. 1966.
- 42. Clearman, Weekly Notes to
Petrone, 3, 25 Mar., 1, 15 Apr. 1966.
- 43. "LC-39 Site Activation Status
Reports," weekly for March and April 1966; Brewster interview; Hahn
interview.
- 44. "LC-39 Site Activation Status
Report," 27 Apr. 1966; Hahn interview.
- 45. "LC-39 Site Activation Status
Reports," weekly reports for Mar. 1966; Weekly Notes, Bagnulo, 25
Mar. 1966; Spaceport News, 10, 31 Mar. 1966.
- 46. Rigell interview; "LC-39 Site
Activation Weekly Reports," Mar., Apr. 1966.
- 47. "LC-39 Site Activation Reports,"
13 Apr., 5 May, 3 Aug. 1966.
- 48. "Minutes of Apollo/Saturn V Site
Activation Board Meeting #24," 26 May 1966; Spaceport News,
26 May 1966.
- 49. "Minutes of Apollo/Saturn V Site
Activation Board Meeting #25," 16 June 1966; Spaceport News,
16 June 1966.
- 50. "Minutes of Apollo/Saturn V Site
Activation Board Meetings" 25, 26, and 27, dated 16, 23 June, 7
July 1966.
- 51. Barfus interview; Enlow
interview; Sparkman interview, 6 Dec. 1973.
- 52. "Minutes of Apollo/Saturn V Site
Activation Board Meeting #27," 7 July 1966.
- 53. "Minutes of Apollo/Saturn V Site
Activation Board Meetings" 27 and 28, dated 7 and 21 July 1966;
Spaceport News, 4 Aug. 1966.
- 54. "Minutes of Apollo/Saturn V Site
Activation Board Meetings" 28 and 29, 21 July, 4 Aug. 1966.
- 55. William I. Moore and Raymond J.
Arnold, "Failure of Apollo/Saturn V Liquid Oxygen Loading System,"
1967 Cryogenic Engineering Conference, 21-23 Aug. 1967, Stanford
Univ., CA, paper K-1, in Advances in Cryogenic Engineering
13 (1967): 534-44; Boeing Atlantic Test Center, "Technical Report
of Complex 39A LOX System Failure, 10 Sept. 1966"; "Fund Board of
Inquiry Findings on Failure of LOX Distribution System - 19 Aug.
1966," J. G. Shinkle, Chairman; "Presentation to the Congressional
Subcommittee on Manned Space Flight," pp. 114-19.
- 56. Moore and Arnold, "Failure of LOX
Loading System," pp. 534-44; "Presentation to the Subcommittee on
Manned Space Flight," pp. 114-19.
- 57. "LC-39 Site Activation Status
Reports," weekly for Sept., Oct. 1966.
- 58. Robert Hotz, Aviation Week
and Space Technology, 22 Mar. 1965, p. 11.
- 59. "KSC Presentation to the NASA
Oversight Subcommittee," 29 Oct. 1968; Petrone interview, 17 Sept.
1970.