Source Notes
Chapter 16: Automating Launch Operations
- 1. Sidney Sternberg, "Automated
Checkout Equipment - The Apollo Hippocrates," in Man on the
Moon, ed. Eugene Rabinowitch and Richard Lewis (New York: Basic
Books. 1969), pp. 196-97.
- 2. W. Haeussermann, Dir., Guidance
and Control Div., MSFC, memo for record, "Meeting on Saturn
Checkout Equipment," 22 July 1960; Paul interview.
- 3. Debus to Dieter Grau, "Automatic
Checkout Committee," 2 Sept. 1960; Richard interview, 12 Dec. 1973.
See B. J. Funderburk, Automation in Saturn I First Stage
Checkout (NASA TN D-4328, Jan. 1968), for story of the Packard
Bell 250 and MSFC's early automation efforts.
- 4. Ludie Richard and Charles O.
Brooks, The Saturn Systems Automation Plan, MSFC. 15 Sept.
1961, sec. II.
- 5. Ibid., sec. VII.
- 6. "Brief Chronological History of
the Saturn V Breadboard," attached to MSFC Automation Plan,
8 May 1962; Burns interview; Greenfield interview.
- 7. Jafferis interviews, 19 Dec. 1973,
22 Jan. 1974; Greenfield interview; Whiteside interview. 4 Jan.
1974.
- 8. Jafferis interview, 19 Dec. 1973;
"Description for Use of Saturn Ground Computer on SA-5," draft copy
in Jafferis's private papers; Spaceport News, 21 May 1964,
p. 2.
- 9. B. E. Duran, "Saturn I/IB Launch
Vehicle Operational Status and Experience," read at Aeronautic and
Space Engineering and Manufacturing Meeting, New York, 7-11 Oct.
1968, Society of Automotive Engineers reprint 680739; KSC,
"Utilization of Saturn/Apollo Control and Checkout System for
Prelaunch Checkout and Launch Operations," GP-663, 25 Mar. 1969.
- 10. W. O. Frost and D. E. Norvell,
"Telemetry System Design for Saturn Vehicles," Proceedings, 1966
International Telemetering Conference, Los Angeles, 18-20 Oct.
1966. p. 70. See also E. A. Robin, "Development and Utilization of
Computer Test Programs for Checkout of Space Vehicles," p. 297;
Canaveral Council of Technical Societies, Proceedings of the
Second Space Congress, Cocoa Beach, FL, 5-
7 Apr. 1965, pp. 617, 634 D. M. Schmidt, "Automatic Checkout
Systems for Stages of the Saturn V Manned Space Vehicle,"
International Convention Record of Electrical and Electronics
Engineers 13 (pt. 4, Mar. 1965), p. 87.
- 11. Canaveral Council of Technical
Societies, Proceedings of the Second Space Congress. p. 656;
William G. Bodie, "Techniques of Implementing Launch Automation
Programs. Saturn IB Space Vehicle System," Practical Techniques
and Applications, 4: 740. See also Apollo/Saturn IB Launch
Operations Plan AS-203, KSC document K-IB-021.3, p. 6-8.
- 12. Duran, "Saturn 1/IB Launch
Vehicle Operational Status"; KSC, "Utilization of Saturn Apollo
Control and Checkout."
- 13. Richard Dutton and William
Jafferis, "Utilization of Saturn/Apollo Control and Checkout System
for Prelaunch Checkout and Launch Operations," paper read at New
York Univ., Project SETE, 24-28 July 1967, pp. 3-34 through 3-43;
Medlock interview; Thompson interview.
- 14. F. Brooks Moore and William
Jafferis, "Apollo/Saturn Prelaunch Checkout Display Systems," read
at IEEE Conference on Displays, Univ. of Loughborough, England,
7-10 Sept. 1971, pp. 7-9.
- 15. Ibid., pp. 9, 15-16.
- 16. Ibid., p. 14.
- 17. Richard Jenke to Benson, 17 Jan.
1975; Richard Smith interview; Medlock interview; Thompson
interview.
- 18. Dutton and Jafferis, "Utilization
of Saturn/Apollo Control and Checkout System," pp. 3-44 through 3-
48; Jenke to Benson, 17 Jan. 1975.
- 19. Jenke to Benson, 17 Jan. 1975;
Medlock and Thompson interviews.
- 20. Jenke to Benson, 17 Jan. 1975;
Medlock and Thompson interviews.
- 21. Fridtjof Speer, Chairman, Saturn
System Evaluation Working Gp., MSFC, to LOD Dir., "Justification
for Early Delivery of the Saturn Blockhouse Records and Sequence
Records," 19 Sept. 1961, Debus reading file.
- 22. R. W. Bivans, G. D. Matthews,
and F. T. Innes, "A Scanning and Digitizing System for Multiple
Asynchronous Telemetry Data Sources," read at National Telemetry
Conference, Los Angeles, June 1964, p. 1, G. D. Matthews's private
papers.
- 23. Bruns interview, 3 Jan. 1974;
Bobby Griffin and G. D. Matthews, The Real-Time Telemetry Data
Processing Effort at the Launch Operations Center,
MTP-LVO-63-2, MSFC,
- 24. Griffin and Matthews,
Real-Time Telemetry Data, pp. 9-11; Bruns interview, 3 Jan.
1974; Corbett, Hughes, and Jelen interviews.
- 25. Griffin and Matthews,
Real-Time Telemetry Data, pp. 3-6; George Matthews
interview.
- 26. Griffin and Matthews,
Real-Time Telemetry Data, pp. 14-17; Bivans, Matthews, and
Innes, "Scanning and Digitizing"; George Matthews interview; LOC
Weekly Notes, Sendler to Debus, 23 Aug., 15 Nov. 1962.
- 27. KSC Computation Br., "Scientific
Computation Support of Saturn/Apollo Vehicle, SA-7," TR-103-2, 3
Dec. 1964.
- 28. Joralan interview, 3 Jan. 1974;
LOC Weekly Notes, Sendler to Debus, 22 Mar. 1962.
- 29. LOC Weekly Notes, Gruene to
Debus, 21 Feb. 1962.
- 30. Raymond Clark, Asst. LOC Dir.,
to Col. Max Carey, "Request for Additional Data on NASA Telemetry
Requirements," 6 Oct. 1962; Debus to Davis, "The AFMTC Launch Area
Telemetry System Plan, 28 September 1962," 18 Oct. 1962.
- 31. Telephone directory, Project
Mercury Field Ops., STG, Cape Canaveral, FL, Sept. 1961; "Patent
Application on ACE, NASA Case No. 8012," encl. to letter, James O.
Harrel to Harold G. Johnson, 20 Jan. 1967, Johnson's private
papers; Walton interview, 17 Dec. 1970. The Cape launch team first
appeared as Preflight Operations Division on a Sept. 1962 MSC
organization chart. Earlier it was called Mercury Field Operations
or MSC's Atlantic Missile Range Operations.
- 32. Parsons interview; Preston
interview, 22 Jan. 1974.
- 33. Parsons interview; Walton
interview, 17 Dec. 1970; Preston interview, 22 Jan. 1974; W. E.
Parsons, Head, Flight Instrumentation Sec., to C. W . Frick, Head,
Apollo Project Off., MSC, "Implementation Plan for Apollo SPACE
System," 26 June 1962, Johnson's private papers; "PACE-S/C
History," compiled by Harold Johnson ca. 1963, Johnson's private
papers.
- 34. Parsons interview; Harold Johnson
interview; "PACE-S/C History"; Walton interview, 17 Dec. 1970.
- 35. Tom S. Walton, MSC Florida Ops.,
Experimental Station Implementation and Planning, 18 Dec.
1964; Walton interview, 17 Dec. 1970.
- 36. "PACE-S/C History"; Parsons
interview; Walton interview, 23 Jan. 1974.
- 37. Parsons interview; Norwalk
interview; Walton interview, 23 Jan. 1974.
- 38. Parsons interview.
- 39. Page interview; Spaceport
News, 6 Jan. 1966; Apollo Support Dept., General Electric Co.,
ACE-S/C, Acceptance Checkout Equipment, Spacecraft, Daytona
Beach. FL. undated.
- 40. Apollo Support Dept., General
Electric Co., ACE-S/C; James O. Hassell to Harold G. Johnson,
"Patent Application on ACE," 20 Jan. 1967, with encl. 1, "Patent
Application on ACE, NASA Case No. 8012," Johnson's private papers;
Harold Johnson interview.
- 41. Moore and Jafferis,
"Apollo/Saturn Prelaunch Checkout," pp. 4-7.