Source Notes
Chapter 21: Success
- 1. MSC, Apollo Spacecraft Program
Quarterly Status Report No. 25, 30 Sept. 1968, p. 28.
- 2. NASA, Current News, 20 December
1968, p. 1; NASA, Astronautics and Aeronautics, 1969, p. 16.
- 3. NASA, Astronautics and
Aeronautics, 1967, pp. 330-31 ; Phillips to Debus, 19 Aug.
1968.
- 4. KSC, "Apollo 9 (AS-504) Daily
Status Reports," May-Oct. 1968.
- 5. Ibid., 8-26 Nov. 1968.
- 6. Ibid., 2-31 Dec. 1968.
- 7. Titusville Star-Advocate,
16 Dec. 1968.
- 8. Renaud interview, 16 May 1973.
- 9. Titusville Star-Advocate,
16 Dec. 1968.
- 10. 10. Ibid.
- 11. Ibid.
- 12. Ibid.
- 13. KSC, "Apollo 9 (AS-504) Daily
Status Reports," 3-9 Jan. 1969.
- 14. Ibid., 10-11 Feb. 1969; KSC
release 33-69, 4 Feb. 1969.
- 15. Ibid., 12, 20 Feb. 1969; KSC,
Apollo/Saturn V Test and Checkout Plan, AS-504 and All
Subsequent Missions, pp. 4-9 through 4-12; Widick interview,
15 Dec. 1970; KSC, Apollo/Saturn V Space Vehicle Countdown
Demonstration Test (Apollo 9), p. vi.
- 16. KSC, "Apollo 9 Daily Status
Report," 27-28 Feb. 1969; NASA, "Apollo 9 Postponement News
Conference," 27 Feb. 1969, CST 12:05, pp. 9A/1 through 9C/2; KSC,
Apollo/Saturn V Space Vehicle Countdown (Apollo 9), pp.
v-vi.
- 17. KSC, Apollo/Saturn V Ground
Systems Evaluation Report, Apollo 9, p. 2-1.
- 18. KSC, "Briefing for the
Subcommittee on Manned Space Flight, Committee on Science and
Astronautics, House of Representatives," 28 Feb. 1969, pp. 44-70.
- 19. Youmans interview, 5 Feb. 1971;
Proffitt interview, 1 Dec. 1970; George Low to C. H. Bolender and
K. S. Kleinknecht, "Chuck Mathews Review of KSC Activities," 14
Sept. 1968, JSC Archives, Apollo activity file.
- 20. KSC, Apollo/Saturn V Launch
Operations Test and Checkout Requirements, AS-504 and All
Subsequent Missions, document K-V-051-01, p. 1-1; Proffitt
interview, 1 Dec. 1970.
- 21. Chart included in folder with
John M. Marshall's interview with Henry C. Paul at KSC, 9 Dec.
1970, in KSC Historian's Office, illustrates graphically the growth
of automation overall and of Atoll in particular for the period
both before and subsequent to AS-504.
- 22. R. B. Johansen, "Developments in
On-Board and Ground Checkout Systems," American Institute of
Aeronautics and Astronautics, Cocoa Beach, FL, 2-4 Feb. 1970, AIAA
paper 70-245, pp. 3-5; James E. Rorex and Robert P . Eichelberger,
"Digital Data Acquisition System in Saturn V," in Proceedings
of the Second Space Congress, 5-7 Apr. 1965, Cocoa Beach, FL,
sponsored by Canaveral Council of Technical Societies, pp. 632-49;
Debus, "Launching the Moon Rocket," p. 25.
- 23. W. V. George and C. A. Stinson,
"An Automated Telemetry Checkout Station for the Saturn V Systems,"
NTC/66: Proceedings, National Telemetering Conference,
Boston, 10-12 May 1966, p. 117.
- 24. NASA Proceedings of the Apollo
Unified S-Band Technical Conference, p. 248; Edmund F.
O'Conner, "Launch Vehicles for the Apollo Program," pp. 165-66;
Walyer O. Frost, "SS-FM: A Telemetry Technique for Wide-Band Data,"
Institute of Radio Engineers, Transactions on Space Electronics
and Telemetry, SET-
2 (Dec. 1962), p. 289, notes the first use of SS-FM telemetry on
the SA-2 flight.
- 25. NASA, Proceedings of the
Apollo Unified S-Band Technical Conference, p. 248.
- 26. Samuel C. Phillips to MSFC, 28
June 1965; Adolf H. Knothe, "Range Safety - Do We Need It?"
American Institute of Aeronautics and Astronautics, Launch
Operations Meeting, Cocoa Beach, FL, Feb. 1970, p. 3.
- 27. "Tracking and Data Acquisition,"
Spaceflight 11 (June 1969): 190; NASA, Proceedings of the
Apollo Unified S-Band Technical Conference, p. 3.
- 28. "How We Will Communicate with
Astronauts on the Moon," Space World, Jan. 1969, pp. 33, 35.
- 29. "Tracking and Data Acquisition,"
p. 190; NASA, Sixteenth Semiannual Report to Congress, 1
July-31 Dec. 1966, pp. 167-68.
- 30. Frank Leary, "Support Net for
Manned Space Flight," Space/Aeronautics, Dec. 1966, pp.
71-72. KSC, "Apollo/Saturn V Launch Operations Plan," AS-501/502,
pp. 7-18 through 7-20 contains a general description of the LIEF
and ALDS systems and their relationship to each other and to
operations at KSC.
- 31. Edmond C. Buckley to Mueller, 26
Aug. 1964.
- 32. Space Daily, 28 Jan. 1966,
p. 177.
- 33. John F. Mason, "Modernizing the
Missile Range: Part 1," Electronics, Feb. 1965, pp. 94-95.
- 34. This conclusion is derived from
the chart shown in NASA, Proceedings of the Apollo Unified
5-Band Technical Conference, p. 296; NASA, Sixteenth
Semiannual Report to Congress, 1 July-31 Dec. 1966, p. 165.
- 35. Twigg interview.
- 36. KSC, "Apollo 11 (AS-506) Daily
Status Reports," Jan.-Apr. 1969; KSC, Kennedy Space Center
Story, 1971 ed., p. 119.
- 37. NASA, Apollo Flight Summary
Report, pp. 82-83.
- 38. KSC, "Apollo Program Milestone
Data," 15 July 1973; KSC, "Apollo 11 Daily Status Reports," 20
May-4 July 1969.
- 39. KSC, Kennedy Space Center
Story, 1971, pp. 121-25; Spaceport News, 23 July 1969.
- 40. Kennedy Space Center
Story, 1971, pp. 222-23.
- 41. Ibid., p. 124; KSC, "Apollo
Countdown Document, C-07."
- 42. Spaceport News, 23 July
1969.
- 43. Ibid.
- 44. Ibid., 30 July 1969.
- 45. Anne M. Lindbergh, Earthshine
(Harcourt Brace Jovanovich: New York, 1969), pp. 42-43.